Making of 'Due West' Live Vol 2
It was a warm Saturday afternoon and everyone was anxious to get started with the filming. After waiting for 30 minutes while the previous act finished filming, we were finally allowed to enter the studio for setup.
gig2.jpg (16280 bytes) We ended up changing the song list just before the cameras started rolling.
*Ouch*

gig3.JPG (14804 bytes) Mean while, in the control booth, the producer, Tom Carpenter is preparing to shoot the session.
gig3.JPG (14804 bytes)
Keith West (My Brother) assembles his Drum kit.
gig3.JPG (14804 bytes)
gig3.JPG (14804 bytes)
gig3.JPG (14804 bytes)
After several hours of taping, we have enough material to complete the 30 minute show.